How We Work

Our Landscaping Process

Eight steps from the first phone call to the final walkthrough — with real timelines, honest payment milestones, and what happens when the monsoon shows up mid-build.

Quick Answer

Our landscaping process has eight steps: free on-site consultation, site and soil assessment, design and proposal, permits and HOA approval, demolition and grading, irrigation and base work, installation, and a final walkthrough. Most residential projects in Las Cruces run two to six weeks from signed proposal to completion, depending on scope, permitting and weather.

8Steps, start to finish
2–6Typical weeks on site
$0Cost for the estimate
48hWritten proposal turnaround

The Eight Steps

Every project runs through the same sequence. Smaller jobs compress several steps into a single day; a full property install spreads them over weeks. What does not change is the order — skipping grading or base work to save a few days is exactly how landscapes fail in their second summer here.

1
Week 1 · 45–90 minutes

Free on-site consultation

We walk the property with you. What you want the space to do matters more than what it looks like on a mood board, so we ask how you actually use the yard, who uses it, and what has failed there before. No charge, and no obligation at the end of it.

You get: an honest read on what is realistic for your lot and budget.
2
Same visit

Site & soil assessment

We check drainage flow, sun and shade across the day, existing irrigation, access for equipment, and how deep the caliche sits. Caliche depth alone can move a quote significantly, because breaking through it is machine work, not shovel work. Finding that out now is far cheaper than discovering it mid-install.

We check: grade, drainage, caliche depth, sun exposure, access width, existing lines.
3
Within 48 hours

Design & written proposal

You receive an itemized proposal — materials, quantities, labor, timeline and exclusions written out, not bundled into one round number. If the full scope is beyond the budget, we phase it and show you what each phase costs, so the decision is yours rather than ours.

You get: line-item pricing, a plant and material list, and a realistic start window.
4
1–4 weeks if required

Permits & HOA approval

Not every project needs this, but some do. Retaining walls above certain heights, work affecting drainage, and anything in an HOA area like Sonoma Ranch can require approval before a crew arrives. We prepare the plan and material specifications in submittable form; you submit it, because the HOA contracts with you rather than with us.

Plan for it: HOA review commonly adds two to four weeks. We schedule around it.
5
1–4 days on site

Demolition & grading

Old turf, failed gravel, dead plants and unsuitable material come out. Then the ground gets shaped so water moves away from your foundation and toward where you want it during monsoon storms. This is the least photogenic stage and the one that decides whether everything above it lasts.

Expect: equipment noise, a dumpster or haul-off truck, and a yard that looks worse before better.
6
2–5 days on site

Irrigation & base work

Drip lines and zones go in before anything covers them, grouped by water need rather than by convenience. Hardscape base material is laid and compacted to the depth the surface actually requires. Everything buried happens now, because reopening a finished patio to fix a line is the most expensive mistake in this trade.

We install: zoned drip, valves, controller wiring, compacted hardscape base.
7
3 days–3 weeks

Installation

Pavers, rock, boulders, edging, turf, trees and planting go in, in that general order so heavy material is never carried across finished surfaces. You will see the yard change daily at this stage. Scope drives the duration far more than yard size does: a gravel conversion moves fast, an outdoor kitchen does not.

You get: daily progress, and a point of contact who answers the phone.
8
60–90 minutes

Final walkthrough & handover

We walk the finished project together, program the irrigation controller in front of you around the current watering ordinance, and explain the establishment watering your new plants need for their first two seasons. Anything on the punch list gets noted and closed out. Final payment comes after this, not before.

You get: controller settings explained, establishment schedule, care guidance, warranty terms.

How Long Will My Project Take?

The honest answer is that scope drives timeline far more than square footage does. These are the on-site ranges we quote against, excluding any HOA or permit wait.

Project typeTypical on-site timeMain variablePermit likely?
Rock / gravel front yard conversion3–5 daysVolume of turf and old material removedRarely
Full xeriscape conversion1–3 weeksIrrigation rework and plant countRarely
Artificial turf install3–6 daysExcavation depth and calicheRarely
Paver patio or walkway4–10 daysBase depth and cutting complexitySometimes
Retaining wall1–2 weeksHeight, drainage behind wall, gradeOften
Irrigation system install2–5 daysZone count and trenching distanceRarely
Full property, new construction lot3–6 weeksGrading scope and phasingSometimes

Who Does What

Most project friction comes from an assumption nobody said out loud. So here it is in writing.

We handle

Our responsibility

  • Site assessment, design and itemized proposal
  • Permit drawings and HOA-ready plan documents
  • All materials, delivery and haul-off of debris
  • Locating and protecting existing irrigation and utility lines
  • Daily site cleanup and safe equipment storage
  • Irrigation programming and the establishment schedule
  • Punch list completion before final payment
We need from you

Your part

  • Clear access to the work area and a water spigot
  • Pets kept inside or secured during work hours
  • Formal submission of the HOA application in your name
  • Decisions on material and plant selections by the agreed date
  • A heads-up about anything buried we would not know about
  • Watering of new plants per the schedule after handover

Payment Milestones

You should know what you are paying and when before signing anything. Our standard structure ties payment to visible progress rather than to a calendar.

At signing

A deposit that covers material ordering and secures your slot in the schedule. Nothing is charged for the estimate or the proposal itself.

At material delivery

Due when rock, pavers, turf or plant material physically arrives on your property, not when it is ordered.

Mid-project

On larger builds only, tied to a defined milestone such as completed grading and base work.

On completion

The final balance is due after the walkthrough and after the punch list is closed out, never before.

Exact percentages and dates are written into your proposal before you sign. If a contractor asks for the full amount upfront, or for cash with no itemized contract, treat that as a warning sign regardless of who they are.

What Happens When Things Change

Weather

Monsoon and heat delays

Between July and September, storms can stop grading, base compaction and paver setting for a day or more. Wet caliche will not compact properly, so we wait rather than build on it. We tell you the same day when a weather delay moves your finish date.

Surprises

What the ground hides

Shallow caliche, buried concrete, an old irrigation line nobody documented, or a drainage problem only visible once turf comes up. If any of these change the scope, work pauses and you get a written change order with the cost before we continue.

Your changes

Mid-project requests

You can change your mind. Adding a bed, upgrading a paver, extending a patio — all workable. Each goes through the same written change order so there is never a surprise number on the final invoice.

After handover

Establishment and follow-up

New plantings need one to two seasons of attentive watering before they are self-sufficient. We leave you a schedule for that and remain reachable afterward. Workmanship and any manufacturer material warranties are stated in your proposal.

Frequently Asked Questions

Yes. The on-site visit, the assessment and the written itemized proposal are all free, with no obligation to proceed. You keep the proposal either way.

It depends on the season and the current schedule. Spring and fall are the busiest windows in Las Cruces, so booking earlier matters then. We give you a realistic start window in the proposal rather than an optimistic one.

No, as long as we have access to the work area and a water source. We do ask that you are available for the initial consultation and the final walkthrough, since both involve decisions.

Yes, and on larger properties we often recommend it. The key is planning all phases at the start so irrigation and grading in phase one connect properly to phase two instead of being torn up and redone.

We can build to an existing plan. We will still walk the site and flag anything that will not work in local soil or drainage conditions before starting, because building a flawed plan correctly still produces a failed landscape.

Because breaking through a caliche layer is machine work rather than hand digging, and its depth varies street by street across Las Cruces. It changes planting hole cost, trenching time and hardscape excavation, which is why we check for it during the assessment rather than guessing.

We prepare the plan, plant list and material specifications in submittable form. You submit it formally, because the HOA agreement is between you and the association. We schedule the build around the approval window.

Call us. Workmanship terms and any manufacturer warranties on materials are written into your proposal, so the coverage is defined before work starts rather than debated afterward.

Next steps

Start With a Free Walkthrough

No pressure and no charge. We look at your lot, tell you honestly what is realistic for your budget, and put an itemized proposal in your hands within 48 hours.